RISK MANAGEMENT PRACTICES AND PERFORMANCE OF MINING PROJECTS IN KWALE COUNTY, KENYA

MICHAEL NGUMBU MUTHUI, TITUS M. KISING’U, PhD

Abstract


The purpose of this research was to examine the influence of risk management practices on the performance of mining projects in Kwale County, Kenya. Specifically, the research examined the influence of risk identification practice and risk analysis practice on the performance of mining projects in Kwale County, Kenya. The theoretical framework consisted of the enterprise risk management theory, systems theory, contingency theory and complexity theory. Drawing on the positivist research philosophy, the research utilized the quantitative non-experimental research methodology. The research employed the correlational cross-sectional survey design for testing noncausal relationships among variables. The proportionate stratified random sampling technique was used to select a sample size of 128 project management staff from a target population of 188 project management staff in charge of the mining projects of the 7 mining companies in Kwale County, Kenya. A pilot study was conducted to test the validity and reliability of the constructed survey questionnaire. A self-administered structured questionnaires was used to collect primary data. The research utilized the cross-sectional survey-based approach. Through the drop and pick method, the survey questionnaires were hand delivered to the project management staff of the mining companies. The collected data was processed and entered into the statistical package for social sciences (SPSS) version 26 to create a data sheet used for statistical analysis. The Pearson’s correlation results indicated that risk identification practice and risk analysis practice had positive and significant relationship with performance of mining projects in Kwale County, Kenya. The multiple regression results showed that risk identification practice and risk analysis practice had positive and significant influence on performance of mining projects in Kwale County, Kenya. The mining project managers should recognize the importance of risk management practices and apply them to their projects to minimize risks for successful projects in the mining industry. The policy makers should initiate policy review to motivate project managers recognize the importance of risk management practices.

Key words: Firm performance, Risk analysis capability, Risk identification capability, Kenya

CITATION: Muthui, M. N., & Kising’u, T. M (2024). Risk management practices and performance of mining projects in Kwale County, Kenya. The Strategic Journal of Business & Change Management, 11 (1), 171 – 197. http://dx.doi.org/10.61426/sjbcm.v11i1.2847


Full Text:

PDF

References


Abdulai, Y., & De-graft, O. M. (2022). Project risk management and construction performance: A Ghanaian study. Academy of Marketing Studies Journal, 26(2), 1-11.

Aboutorab, H., Hussain, O. K., Saberi, M., Hussain, F. K., & Chang, E. (2021). A survey on the suitability of risk identification techniques in the current networked environment. Journal of Network and Computer Applications, 178, 102984.

Abuya, W. (2023). Does corporate social responsibility (CSR) actually develop mining communities? An examination of CSR programmes in Kenya’s mining sector. In Corporate Social Responsibility in Developing Countries: Challenges in the Extractive Industry (pp. 83-109). Cham: Springer International Publishing.

Ahmad, U., Hussain, M., Khan, A. A., & Huraira, A. (2022). Impact of project risk management and leadership development on the project success with moderating role of risk manager. Journal of Business and Social Review in Emerging Economies, 8(2), 481-494.

Akbar, F., & Shahid, R. (2022). Risk management (RM) and project success (PS) of electrical power transmission and distribution systems: the moderation role of human resource management. International Journal of Energy Sector Management, Vol. ahead-of-print No. ahead-of-print. doi.org/10.1108/IJESM-03-2021-0010.

Al Saadi, N., & Norhayatizakuan, N. (2021). The impact of risk management practices on performance of construction projects. Studies of Applied Economics, 39(4), 1-10.

Alkaissy, M., Arashpour, M., Li, H., Alaghmand, S., & Nezamian, A. (2022). Quantitative analysis of safety risks and relationship with delayed project completion times. Risk analysis, 42(3), 580-591.

Alkhlaifat, B. (2021). The effect of project management performance with the roles of project risk management: Evidence from ICT projects in public healthcare sectors in Jordan. International Journal of Academic Research in Business and Social Sciences, 11(3), 1278-1304. Available at SSRN 3818232.

AlMarzooqi, A. H., Kasdirin, H. A., & Mansor, N. (2022). Development of risk management practices in the electricity sector of the UAE. Journal of Management Information & Decision Sciences, 25(3), 33-56.

ALSaadi, N., & Norhayatizakuan, N. (2021). The impact of risk management practices on performance of mining projects. Studies of Applied Economics, 39(4), 1-10.

Alsalem, M. A., Mohammed, R., Albahri, O. S., Zaidan, A. A., Alamoodi, A. H., Dawood, K., ... & Jumaah, F. (2022). Rise of multiattribute decision‐making in combating COVID‐19: A systematic review of the state‐of‐the‐art literature. International Journal of Intelligent Systems, 37(6), 3514-3624.

Amegayibor, G. K. (2022). Leading local government during COVID-19: An empirical finding from Ghana. Annals of Human Resource Management Research, 2(1), 43- 58.

Aramali, V., Sanboskani, H., Gibson Jr, G. E., El Asmar, M., & Cho, N. (2022). Forward-looking state-of-the-art review on earned value management systems: The Disconnect between Academia and Industry. Journal of Management in Engineering, 38(3), 03122001.

Assaad, R., El-Adaway, I. H., & Abotaleb, I. S. (2020). Predicting project performance in the construction industry. Journal of Construction Engineering and Management, 146(5), 14-23.

Bahamid, R. A., Doh, S. I., Khoiry, M. A., Kassem, M. A., & Al-Sharafi, M. A. (2022). The current risk management practices and knowledge in the construction industry. Buildings, 12(7), 1016-1027.

Banda, W. (2023). A system dynamics model for assessing the impact of fiscal regimes on mining projects. Resources Policy, 81, 103408.

Bell, E., Bryman, A., & Harley, B. (2022). Business research methods. Oxford university press.

Bissah, Z., & Nkrumah, V. (2021). Risk management practices in the construction industry in Ghana: A case study of two construction companies in Sekondi Takoradi Metropolis. International Journal of Innovative Science and Research Technology, 6(5), 759-768.

Bukar, A. A. (2022). Impact of risk analysis on project cost in building construction industry in Abuja in Nigeria. World Journal of Management and Business Studies, 2(2), 360-369.

Bukar, A. A., & Ibrahim, U. A. (2021). Investigating the impact of risk management on project performance in construction industry: Evidence from Nigeria. Science Journal of Business and Management, 9(3), 224-238.

Castellini, M., & Riso, V. (2023). Risk management in practice: A multiple case study analysis in Italian municipalities. Journal of Risk and Financial Management, 16(1), 30.

Cheng, Y., & Fisk, A. (2022). Contingency theory informs relationship management: Exploring the contingent organization-public relationships (COPR) in a crisis of Mainland China. Public Relations Review, 48(2), 102178.

Chepkoech, G., & Wairimu, A. (2023). Project scope management practices and performance of marine fishing projects in Kilifi County, Kenya. International Journal of Management and Business Research, 5(2), 120-132.

Chileshe, N., Njau, C. W., Kibichii, B. K., Macharia, L. N., & Kavishe, N. (2022). Critical success factors for Public-Private Partnership (PPP) infrastructure and housing projects in Kenya. International Journal of Construction Management, 22(9), 1606-1617.

Chilumo, J., Odiembo, S., Aloo, Z., Ruwa, A. H., Mwakwi, S., Kithome, O. M., & Kyalo, D. N. (2020). Risk management practices on performance of building construction projects. Journal of Entrepreneurship & Project Management, 4(6), 4(6), 38-57.

Courgeau, D. (2022). Mechanisms, systems, autonomy, hermeneutics, and understanding human life. In Understanding Human Life (pp. 207-244). Springer, Cham.

Devereaux, A. (2022). Seven stepping stones to a systems theory of economics. Available at SSRN.

Dooley, K. J. (2022). Complex adaptive systems. In Handbook of Theories for Purchasing, Supply Chain and Management Research (pp. 335-344). Edward Elgar Publishing.

Dumelle, M., Kincaid, T., Olsen, A. R., & Weber, M. (2023). Spsurvey: Spatial sampling design and analysis in R. Journal of Statistical Software, 105, 1-29.

Dvorski Lacković, I., Kurnoga, N., & Miloš Sprčić, D. (2022). Three-factor model of enterprise risk management implementation: Exploratory study of non-financial companies. Risk Management, 24(2), 101-122.

Easterby-Smith, M., Jaspersen, L. J., Thorpe, R., & Valizade, D. (2021). Management and business research. Sage.

Ekwelem, D. O., Okolie, K. C., Ezeokoli, F. O., & Okongwu, M. I. (2021). Assessing the impact of risk management techniques on the cost of building projects in South-East Nigeria. PM World Journal, 10(9), 1-13.

Fagan, M. B., & Maienschein, J. (2022). Theories of Biological Development. Stanford Encyclopedia of Psychology.

Fehrenbacher, D., Sutton, S. G., & Weisner, M. M. (2022). Spatial Distance and Risk Category Effects in Enterprise Risk Management Practice. Journal of Management Accounting Research, 34(3), 119-139.

Fragapane, G., Hvolby, H. H., Sgarbossa, F., & Strandhagen, J. O. (2023). Autonomous mobile robots in sterile instrument logistics: An evaluation of the material handling system for a strategic fit framework. Production Planning & Control, 34(1), 53-67.

Gitonga, J.M., Muchelule, Y., & Nyang’au, S. (2022). Project cost management and performance of urban road projects in Kenya. Journal of Entrepreneurship & Project Management, 2(5), 21-28.

Hassanen, M. A. H., & Abdelalim, A. M. (2022). Risk identification and assessment of mega industrial projects in Egypt. International Journal of Management and Commerce Innovation (IJMCI), 10(1), 187-199.

Haynes, P., & Alemna, D. (2022). A systematic literature review of the impact of complexity theory on applied economics. Economies, 10(8), 192-215.

Hickson, R. J., & Owen, T. L. (2022). Project management for mining: Handbook for delivering project success. Society for Mining, Metallurgy & Exploration.

Huang, Q., Zhang, K., Wang, Y., Bodla, A. A., & Zhu, D. (2023). When is authoritarian leadership less detrimental? The role of leader capability. International Journal of Environmental Research and Public Health, 20(1), 707-723.

Igihozo, M. L., & Irechukwu, E. N. (2022). Project risk management process and performance of Mpazi channel construction project in Nyabugogo, Kigali-Rwanda. Journal of Strategic Management, 6(2), 31-44. doi.org/10.53819/81018102t2047

Ika, L. A., & Pinto, J. K. (2022). The “re-meaning” of project success: Updating and recalibrating for a modern project management. International Journal of Project Management, 40(7), 835-848.

Ingle, P. V., & Mahesh, G. (2022). Construction project performance areas for Indian construction projects. International Journal of Construction Management, 22(8), 1443-1454.

Jahan, S., Khan, K. I. A., Thaheem, M. J., Ullah, F., Alqurashi, M., & Alsulami, B. T. (2022). Modeling profitability-influencing risk factors for construction projects: A system dynamics approach. Buildings, 12(6), 701-723.

Jia, D., & Wu, Z. (2022). Application of machine learning in enterprise risk management. Security and Communication Networks, 2022.

Jin, H. (2023). Analyzing factors and resource policymaking options for sustainable resource management and carbon neutrality in mining industry: Empirical study in China. Resources Policy, 86, 104185.

Jing, C. K., Seng, A. K., & Teck, T. S. (2021). A study on the factors influencing project success in electrical and electronic manufacturing sector in Penang, Malaysia. Review of International Geographical Education Online, 11(8), 1113- 1142.

Kabutiei, G. J., Nyang’au, P. S., & Muchelule, W. (2022). The relationship between risk identification and the performance of national irrigation authority projects in Kenya. International Journal of Social Sciences Management and Entrepreneurship (IJSSME), 6(2), 45-64.

Kallow, M. A., Bodla, A. A., Ejaz, A., & Ishaq, M. R. (2022). How do risk management practices lead to project success in the construction industry? The mediated moderation of risk coping capacity and risk transparency. International Journal of Construction Management, 1-9.

Kamal, A., Abas, M., Khan, D., & Azfar, R. W. (2022). Risk factors influencing the building projects in Pakistan: from perspective of contractors, clients and consultants. International Journal of Construction Management, 22(6), 1141- 1157.

Kamel, A., Elwageeh, M., Bonduà, S., & Elkarmoty, M. (2023). Evaluation of mining projects subjected to economic uncertainties using the Monte Carlo simulation and the binomial tree method: Case study in a phosphate mine in Egypt. Resources Policy, 80, 103266.

Kanyumba, B. (2023). CSR and labor policies in the South African mining industry. In Corporate Social Responsibility in Developing Countries: Challenges in the Extractive Industry (pp. 255-264). Cham: Springer International Publishing.

Kasperson, J. X., Kasperson, R. E., Turner, B. L., Hsieh, W., & Schiller, A. (2022). Vulnerability to global environmental change. In The social contours of risk (pp. 245-285). Routledge.

Kerzner, H. (2022). Project management metrics, KPIs, and dashboards: a guide to measuring and monitoring project performance. John Wiley & Sons.

Khisa, M. M., & Mutiso, J. (2022). Project control risk management and performance of selected construction projects in Kenya. International Journal of Social Sciences Management and Entrepreneurship (IJSSME), 6(1), 170-183.

Kloeckner, J., Alves, J. L. O., Silva, F. H., Guimaraes, O. R., Bassani, M. A., & Costa, J. F. C. (2021). Application of risk assessment to improve sustainability in bauxite mining. Resources Policy, 74, 102328.

Kong, L. (2023). Risk management of the “belt and road initiative” projects - An empirical study on investments of the Chinese state-owned-banks in the region (Doctoral dissertation).

Kowszyk, Y., Vanclay, F., & Maher, R. (2023). Conflict management in the extractive industries: A comparison of four mining projects in Latin America. The Extractive Industries and Society, 13, 101161.

Lopes, A., Ruiz, R., Ribeiro, R., & Cantelmo, W. (2023). Linkages in the metal mining industry: Local job multipliers in Brazil. Resources Policy, 82, 103545.

Mahama, H., Elbashir, M., Sutton, S., & Arnold, V. (2022). Enabling enterprise risk management maturity in public sector organizations. Public Money & Management, 42(6), 403-407.

Marwa, M., & Altaie, M. R. (2022). Use risk score method to identify the qualitative risk analysis criteria in tendering phase in construction projects. Journal of Engineering, 28(7), 31-42.

Mbugua, M. W. (2022). Development of a performance index for building construction projects in Kenya (Master’s thesis, JKUAT-COETEC).

Monehin, D., & Diers-Lawson, A. (2022). Pragmatic optimism, crisis leadership, and contingency theory: A view from the C-suite. Public Relations Review, 48(4), 10-22.

Moorhead, M., Armitage, L., & Skitmore, M. (2021). Risk management processes used in determining project feasibility in the property development process early stages by Australia/New Zealand property developers. Journal of Property Investment & Finance, Vol. ahead-of-print No. ahead-of-print. doi.org/10.1108/JPIF-08-2021-0071

Muneer, M., Khan, N., Awais Hussain, M., Shuai, Z., Khan, A. A., Farooq, R., ... & Tariq, M. A. U. R. (2022). A quantitative study of the impact of organizational culture, communication management, and clarity in project scope on constructions’ project success with moderating role of project manager’s competencies to enhance constructions management practices. Buildings, 12(11), 1856.

Muthukrishnan, M. N., & Ganapathi, R. A. (2021). Study on risk management practices in construction projects in India. Turkish Online Journal of Qualitative Inquiry, 12(7), 8804-8816.

Mutunga, M. S., & Ondara, A. (2021). Risk management practices and project performance at Kenya Airports Authority. Journal of Entrepreneurship & Project Management, 5(1), 45-63.

Nakayama, J., Suzuki, T., Owada, S., Shiota, K., Izato, Y. I., Noguchi, K., & Miyake, A. (2022). Qualitative risk analysis of the overhead hydrogen piping at the conceptual process design stage. International Journal of Hydrogen Energy, 47(22), 11725- 11738.

Nalule, V. R. (2023). 3 Modernisation of the mining laws and key issues for consideration in Africa. Mining Law and Governance in Africa: Transformation and Innovation for a Sustainable Mining Sector.

Ndunda, C. K., Ndunda, E. M., & Mutinda, M. N. (2023). Natural resource project–induced displacement and resettlement and its influence on the subjective well-being of households displaced by titanium mining in the Southern Coast of Kenya. International Journal of Community Well-Being, 1-17.

Ndungutse I. N. (2021). Project risk management and the performance of public private partnership in infrastructure project: A case study of SUS Water & Sanitation Project No P-RW-F00-016 2016-2019 (Doctoral dissertation, University of Rwanda).

Nyarangi, J. M., & Ngali, R. (2021). Risk management practices and financial performance of insurance companies listed in Nairobi Securities Exchange, Kenya. International Academic Journal of Economics and Finance, 3(7), 176-197.

Nzioki, J. M., & Mwenda, M. N. (2020). Promoting performance of the building construction industry through risk identification: A case of exchequer funded building construction projects in Machakos County, Kenya.

Obondi, K. (2022). The utilization of project risk monitoring and control practices and their relationship with project success in construction projects. Journal of Project Management, 7(1), 35-52.

Obondi, K. C. (2020a). The impact of project risk audits on construction project success. Journal of Engineering Management and Competitiveness (JEMC), 10(2), 103-115.

Obondi, K. C. (2020b). The relationship between project risk monitoring, control practices, and project success in construction projects (Doctoral dissertation, Northcentral University).

Oke, A. E., Arowoiya, V. A., & Akomolafe, O. T. (2022). Influence of the internet of things’ application on construction project performance. International Journal of Construction Management, 22(13), 2517-2527.

Okong’o, O. F. (2022). Risk management and performance of information technology projects by commercial banks in Kenya (Doctoral Dissertation, Kenyatta University).

Olobo, M., Karyeija, G., Sande, P., & Khoch, S. (2021). Credit risk management practices and performance of commercial banks in South Sudan. Journal of Financial Risk Management, 10(3), 306-316.

Omondi, V. O., & Muchelule, Y. (2022). Project risk management on performance of Kenya Rural Roads Authority in Siaya County. International Journal of Social Sciences Management and Entrepreneurship (IJSSME), 6(1), 146-158.

Opondo, E. M. (2023). Corporate social responsibility initiatives and project performance in the mining industry in Kenya: A case of Tata Chemicals Magadi (Masters dissertation, Africa Nazarene University).

Osei-Kyei, R., Narbaev, T., & Ampratwum, G. (2022). A scientometric analysis of studies on risk management in construction projects. Buildings, 12(9), 1342.

Otieno, E. A., Ogutu, M., Ndemo, B., & Pokhariyal, G. (2020). The effect of enterprise risk management and macro environment on the performance of Kenyan state- owned corporations. DBA Africa Management Review, 10(3), 30-57.

Pecina, E., Miloš Sprčić, D., & Dvorski Lacković, I. (2022). Qualitative analysis of enterprise risk management systems in the largest European electric power companies. Energies, 15(15), 5328.

Petriglieri, G., & Louise Petriglieri, J. (2022). The work is alive! Systems psychodynamics and the pursuit of pluralism without polarization in human relations. Human Relations, 7(8), 10-18.

Portny, J. L., & Portny, S. E. (2022). Project management for dummies. John Wiley & Sons.

Ramezani, N., Bhati, A., Murphy, A., Routh, D., & Taxman, F. S. (2022). Assessing the reliability and validity of the Risk-Need-Responsivity (RNR) program tool. Health & Justice, 10(1), 1-16.

Rehman, M. S. U., Shafiq, M. T., & Afzal, M. (2021). Impact of COVID-19 on project performance in the UAE construction industry. Journal of Engineering, Design and Technology. Journal of Engineering, Design and Technology, 20(1), 245-266. doi.org/10.1108/JEDT-12-2020-0481

Reinhard, R. L., Sorensen, P. F., & Yaeger, T. F. (2022). Organization development in the largest global organization: The history of OD in the US Military. IAP.

Richard, E., & Pascal, W. (2022). Risk management in upstream oil and gas businesses in Tanzania. Business Management Review, 25(1), 111-131.

Rizwan, M. (2021). impact of project risk attributes on project success (Master’s dissertation, Tallinn University of Technology).

Rozengard, M. A. (2022). Business effects of online doctoral attrition: a quantitative study using binary logistic regression (Doctoral dissertation, Saint Leo University).

Safaeian, M., Fathollahi-Fard, A. M., Kabirifar, K., Yazdani, M., & Shapouri, M. (2022). Selecting appropriate risk response strategies considering utility function and budget constraints: A case study of a construction company in Iran. Buildings, 12(2), 98.

Sahal, S. K. (1979). Contingency theories of leadership: A study. Human Relations, 32(4), 313-322.

Sami Ur Rehman, M., Thaheem, M. J., Nasir, A. R., & Khan, K. I. A. (2022). Project schedule risk management through building information modelling. International Journal of Construction Management, 22(8), 1489-1499.

Sarkar, D., & Singh, M. (2022). Risk analysis by integrated fuzzy expected value method and fuzzy failure mode and effect analysis for an elevated metro rail project of Ahmedabad, India. International Journal of Construction Management, 22(10), 1818-1829.

Senses, S., & Kumral, M. (2023). Embedding extreme events to mine project planning: Implications on cost, time, and disclosure standards. Resources Policy, 86, 104162.

Shad, M. K., Lai, F. W., Shamim, A., McShane, M., & Zahid, S. M. (2022). The relationship between enterprise risk management and cost of capital. Asian Academy of Management Journal, 27(1), 79-103.

Shafiuddin, M., Durrani, B., Al-Bulushi, A. R. A. K., Al-Farsi, T. S. I., & Al-Hosni, R. (2022). Importance of human resource management in risk management: A study with IT industry. Sch J Econ Bus Manag, 4, 63-69.

Shayan, S., Pyung Kim, K., & Tam, V. W. (2022). Critical success factor analysis for effective risk management at the execution stage of a construction project. International Journal of Construction Management, 22(3), 379-386.

Shenkar, O., & Ellis, S. (2022). The rise and fall of structural contingency theory: A theory’s ‘autopsy’. Journal of Management Studies, 59(3), 782-818.

Shimaponda-Nawa, M., & Nwaila, G. T. (2024). Integrated and intelligent remote operation centres (I2ROCs): Assessing the human–machine requirements for 21st century mining operations. Minerals Engineering, 207, 108565.

Shonhadji, N., & Maulidi, A. (2022). Is it suitable for your local governments? A contingency theory-based analysis on the use of internal control in thwarting white-collar crime. Journal of Financial Crime, 29(2), 770-786.

Singh, R., Bohra, K. A., & Dalal, A. K. (1979). Favourableness of leadership situations studied with information integration theory. European Journal of Social Psychology, 9(3), 253-264.

Skitmore, M., Xiong, B., Xia, B., Masrom, A., & Newton, S. (2020). Relationship between contractor satisfaction and project management performance. Construction Economics and Building, 20(4), 1-24.

Song, J., Martens, A., & Vanhoucke, M. (2022). Using earned value management and schedule risk analysis with resource constraints for project control. European Journal of Operational Research, 297(2), 451-466.

Sugianto, I. M., Pujawan, I. N., & Purnomo, J. D. T. (2023). A study of the Indonesian trucking business: Survival framework for land transport during the Covid-19 pandemic. International Journal of Disaster Risk Reduction, 84, 103451.

Swanson, R. A. (2022). Foundations of human resource development. Berrett-Koehler Publishers.

Tahir, O., Tahir, I., & Shujaat, S. (2019). Effects of risk management practices on project success in the construction industry of Pakistan. International Journal of Business and Management Study–IJBMS, 6(2), 230-235.

També Bearpark, N. (2022). Risk and Luhmann’s Systems Theory. In Deconstructing Money Laundering Risk (pp. 45-88). Springer, Cham.

Tarjo, T., Vidyantha, H. V., Anggono, A., Yuliana, R., & Musyarofah, S. (2022). The effect of enterprise risk management on prevention and detection fraud in Indonesia’s local government. Cogent Economics & Finance, 10(1), 2101222.

Thakur, R., & Hale, D. (2022). Strategic crisis response: managerial implications and direction for recovery and survival. Journal of Business & Industrial Marketing, 37(10), 1959-1979. doi.org/10.1108/JBIM-01-2021-0029

Turi, J. A., & Sarfraz, M. (2022). The impact of perceived organizational politics and political risk on project success through ethical leadership and the psychological contract. Kybernetes, (ahead-of-print).

Xing, M., Cao, J., & Cao, D. (2023). Impacts of policy mix comprehensiveness on BIM implementation: Moderating effects of environmental state and response uncertainty. Journal of Construction Engineering and Management, 149(2), 171-182.

Yahaya, O. A., & Yakubu, I. (2022). Risk committee’s influence on enterprise risk management. Journal of Risk and Financial Management, 15(4), 120-139.

Wang, L., Qian, C., & Goh, M. (2022). Integrated approach for project risk assessment and evaluation under risk interactions. IEEE Transactions on Engineering Management., 4(1), 1-12. doi: 10.1109/tem.2022.3174006

Wang, X. (2023). Construction of economic management performance model of mining enterprises under the background of supply-side reform. WSEAS Transactions on Business and Economics, 20, 2066-2076.

Watema, J., & Tulirinya, J. (2021). Project implementation, risk management practices and project success. East African Journal of Business and Economics, 3(1), 36-50

Wideman, R. M. (2022). Project and program risk management a guide to managing project risks and opportunities. Project Management Institute, Inc.

Wu, J., Chen, X., Bie, Y., & Zhou, W. (2023). A co-evolutionary lane-changing trajectory planning method for automated vehicles based on the instantaneous risk identification. Accident Analysis & Prevention, 180, 106907.

Wuni, I. Y., Shen, G. Q., Osei-Kyei, R., & Agyeman-Yeboah, S. (2022). Modelling the critical risk factors for modular integrated construction projects. International Journal of Construction Management, 22(11), 2013-2026.

Yang, L., Lou, J., & Zhao, X. (2021). Risk response of complex projects: Risk association network method. Journal of Management in Engineering, 37(4), 50-64.

Yeung, J. F., Chan, D. W., Chan, J. H., & Lok, K. L. (2022). Development of a Composite Project Performance Index for the New Engineering Contract (NECPPI) of construction projects in Hong Kong: A Delphi study. International Journal of Construction Management, 1-14.

Yousefian, M., Bascompta, M., Sanmiquel, L., & Vintró, C. (2023). Corporate social responsibility and economic growth in the mining industry. The Extractive Industries and Society, 13, 101226.

Zaman, U., Florez-Perez, L., Abbasi, S., Nawaz, S., Farías, P., & Pradana, M. (2022). A stitch in time saves nine: Nexus between critical delay factors, leadership self-efficacy, and transnational mega construction project success. Sustainability, 14(4), 2091.

Zheng, J., Feng, C., Xie, H., Zhao, X., & Wu, G. (2023). Ambidextrous leadership and innovative behaviors in construction projects: Dual-edged sword effects and social information processing perspective. Journal of Management in Engineering, 39(1), 40-57.




DOI: http://dx.doi.org/10.61426/sjbcm.v11i1.2847

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.

PAST ISSUES:
20242023202220212020201920182017201620152014
Vol 11, No 2 [2024]Vol 10, No 4 [2023]Vol 9, No 4 [2022]Vol 8, No 4 [2021]Vol 7, No 4 [2020]Vol 6, No 4 [2019]Vol 5, No 4 [2018]Vol 4, No 4 [2017]Vol 3, No 4 [2016]Vol 2, No 2 [2015]Vol 1, No 2 [2014]
 Vol 11, No 1 [2024] Vol 10, No 3 [2023] Vol 9, No 3 [2022]Vol 8, No 3 [2021]Vol 7, No 3 [2020]Vol 6, No 3 [2019]Vol 5, No 3 [2019]Vol 4, No 3 [2017]Vol 3, No 3 [2016]Vol 2, No 1 [2015]Vol 1, No 1 [2014]
  Vol 10, No 2 [2023] Vol 9, No 2 [2022]Vol 8, No 2 [2021]Vol 7, No 2 [2020]Vol 6, No 2 [2019]Vol 5, No 2 [2018]Vol 4, No 2 [2017]Vol 3, No 2 [2016]  
  Vol 10, No 1 [2023] Vol 9, No 1 [2022]  Vol 8, No 1 [2021]Vol 7, No 1 [2020]Vol 6, No 1 [2019]Vol 5, No 1 [2018]Vol 4, No 1 [2017]Vol 3, No 1 [2016]   


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.